When steel beams or a steel roof need fire protection, there are usually three ways to do it: spray the steel with vermiculite, box each member with fire-rated boards, or install a fire-rated ceiling below the steel. Each can be the right answer – it depends on the building and what happens above the ceiling.
Option 1: Vermiculite spray on the steel
Each beam and column is sprayed directly with cementitious fireproofing to the thickness required for the rating.
- Good for: large areas of steel, warehouses, factories, steel hidden above ceilings.
- Pros: usually the most economical per square metre of steel; fast over large areas; protection stays with the steel.
- Watch out for: rough finish; can be damaged when services are fixed later; needs external grade outdoors.
Option 2: Fire-rated board encasement
Each steel member is boxed with fire-rated boards fixed to a frame or directly to the steel.
- Good for: visible columns and beams, offices, shops, staircases.
- Pros: clean, paintable finish; a dry process with no overspray.
- Watch out for: more labour on complex steel shapes; joints and fixings must follow the tested system.
Option 3: Fire-rated ceiling below the steel
A tested fire-rated ceiling system is installed below the steel, protecting everything in the space above.
- Good for: roofs and floors with many small steel members, where a ceiling is needed anyway.
- Pros: one continuous layer instead of protecting each member; finished ceiling in one step.
- Watch out for: every light fitting, access hatch and service opening in the ceiling must suit the fire-rated system; services in the ceiling void and later changes need careful control.
Questions that decide the choice
- Will people see the steel? If yes, boards (or intumescent paint) usually win on appearance.
- How many services are in the ceiling void? Many openings can make a fire-rated ceiling complex.
- Will the space change often? Frequent changes favour protecting the steel itself.
- What rating is required? Your QP will confirm the fire resistance period, from 1 hour up to 4 hours.
- Is the area internal or external? External steel needs systems rated for weather exposure.
Our services: vermiculite spray and fire-rated boards, walls and ceilings using Promat, Knauf and USG Boral systems.
Not sure which option fits your building?
WhatsApp us photos, the site location and the fire rating required. WhatsApp 9072 0570 or email sales@fireproofingsys.com.