Fire-Rated Drywall Partitions in Singapore: What Makes a Wall Truly Fire-Rated

Many people think a wall is fire-rated because it uses fire-rated boards. In reality, a fire-rated partition is a complete tested system. The boards are only one part. If any part of the system is changed or left out, the wall may not achieve its rating – even though it looks finished.

What is in a fire-rated partition system

  • Boards – the specified fire-rated board type and thickness, often in two or more layers.
  • Studs and tracks – the specified steel stud size and spacing.
  • Fixings – screw type and spacing as per the tested design.
  • Joints – staggered board joints, taped and set.
  • Insulation – where the system requires mineral wool in the cavity.
  • Sealing – head, base and perimeter joints sealed with compatible fire-rated sealant.

We install systems from Promat, Knauf and USG Boral to the manufacturer’s system details. Each manufacturer’s system has been tested as a whole, so components should not be mixed between brands.

Five details that most often fail

1. The wall stops at the false ceiling

A compartment wall must go up to the underside of the slab or roof above. A wall that stops at the ceiling grid leaves a gap for fire and smoke to travel over the top.

2. Unsealed penetrations

Pipes, cable trays and ducts that pass through the wall must be sealed with a fire-stopping product suited to the service. Open holes, foam filler or ordinary sealant are common findings.

3. Services added after handover

New data cables, aircon pipes or sprinkler changes are often run through fire-rated walls months after the fit-out, without fire-stopping.

4. Wrong doors and frames

Openings in a fire-rated wall need fire-rated doors and frames that match the wall rating, with the correct ironmongery.

5. Damaged or patched boards

Holes patched with ordinary plaster or a single layer of board where the system needs two layers.

Fire ratings

Depending on the system and build-up, board partitions can achieve fire resistance periods from 1 hour up to 4 hours. The required rating is set by your QP or consultant according to the use of the space.

Before you close the ceiling

  1. Check that every fire-rated wall continues above the ceiling to the slab.
  2. Check every service penetration is sealed.
  3. Take photos for your records – once the ceiling closes, it is hard to prove.

See our fire-rated boards and walls service, or read about fire-rated wall installation in Singapore.

Need fire-rated partitions or a wall check?

WhatsApp us photos, the site location and the fire rating required. WhatsApp 9072 0570 or email sales@fireproofingsys.com.